The operation steps of rubber plate vulcanization machine:
​1. Check whether the fuel tank reaches the required scale before the experiment, and then turn on the machine to check whether the components work normally, and whether the column (frame plate) is lubricated.
​2. Pay attention to the hot plate temperature when preheating. If it does not meet the requirements, it must be adjusted under the guidance of the manufacturer’s technicians. Do not move without permission.
​3. When placing the mold between the hot plate, prevent burns or extrusion accidents, and do not place the mold when the hot plate rises.
​4. After the mold is installed, it should be placed in the middle of the board, and the person should stand in the center of the console. After closing the mold, turn off the motor when the required pressure is reached. If they do not meet the requirements, ask technical personnel to adjust them. Do not move without permission.
​5. With iron hook to take the mold, to prevent crushing hands. If the product sticks to the mold during the mold opening process, please carefully strike the mold opening tool to prevent the mold from falling or injuring your feet.
​6. If the machine failure, must immediately cut off the power and feedback to the technician. Do not disassemble all parts without permission. Handling molds without permission is strictly prohibited.
​7. After the end of the experiment, cut off the power, clean it, and fill in the use record after the technical personnel check.
​The above content is “vulcanizing machine simple operation process”. Do not adjust the machine without permission. If some parameters are properly adjusted, modifying them arbitrarily may result in a bad product. The best way is to get a technician to debug it.